Case Study Legal Review of a Compensation Claim Exceeding SAR 1 Million for Copyright Infringement Involving Academic Research Dispute Value...
A contractual dispute arose concerning the design, manufacture, and installation of bespoke wooden interior works for a private residential project, valued at over SAR 5 million, with claims exceeding SAR 2 million.Under the parties’ mediation agreement, the matter was referred to the Saudi Center for Commercial Arbitration, which appointed a neutral mediator. The dispute involved contract extensions, outstanding works, technical defects, and additional works, and concluded with an amicable settlement.
Construction, interior fit-out, and artistic works
More than SAR 5 million
More than SAR 2 million
Institutional mediation
Saudi Center for Commercial Arbitration
Amicable settlement reached by mutual consent
A contractual dispute arose concerning the design, manufacture, and installation of bespoke wooden interior works for a private residential property. The parties disagreed over the contractual period, completion of outstanding works, quality issues, technical defects, and additional works arising from a subsequent quotation.Pursuant to the contract’s mediation agreement, the dispute was referred to the Saudi Center for Commercial Arbitration, which appointed Prof. Dr. Turki Al-Tayyar as a neutral mediator. The mediation addressed the interconnected issues of time extension, incomplete works, defect rectification, and additional works, ultimately resulting in an amicable settlement accepted by both parties.
Construction Works Contract
Wood Interior Works
Private residential project
Institutional mediation
Multi-Issue Contractual Dispute Involving Interior Design and Fit-Out Works, Including Time Extensions, Defects, and Additional Works
The mediation involved analysing the parties’ positions, identifying key disputes, reviewing contractual and technical obligations, and guiding negotiations toward a mutually acceptable resolution.
Assessing the request to extend the contractual period for completion of the project.
Identifying the contracted works that remained incomplete.
Reviewing the issues alleged in relation to manufacturing and installation quality.
Addressing claims connected with further works under a subsequent quotation.
Reviewing the financial claims arising from the performance and additional works.
Developing a consensual framework capable of resolving the various claims together.
The disagreement extended beyond a monetary claim and included time, performance, quality, rectification, and additional works.
The parties held different positions regarding which works had been completed and which obligations remained outstanding.
The dispute involved issues concerning the quality of manufacturing and installation and the scope of required remedial works.
It was necessary to address the legal and practical effect of extending the contractual term on the remaining obligations.
The additional works introduced a separate contractual element that had to be reconciled with the original agreement.
The mediation required a single settlement capable of addressing all principal issues rather than resolving each claim in isolation.
The dispute was divided into distinct issues concerning time, performance, defects, and additional works.
The mediation focused on the issues of greatest practical importance to completing the project and ending the dispute.
The process moved beyond the parties’ stated claims and examined the practical interests that could be achieved through settlement.
Manufacturing, installation, and rectification issues were considered by reference to the underlying contractual obligations.
The mediation sought a settlement structure capable of addressing the parties’ competing obligations and claims.
The process concluded by translating the areas of agreement into a consensual settlement accepted by the parties.
Conducting the mediation from appointment through conclusion.
Identifying the contractual, technical, and financial matters in dispute.
Facilitating discussions between the parties independently and impartially.
Reducing the gap between the parties’ respective positions on performance and rectification.
Exploring practical alternatives for resolving each principal issue.
Assisting the parties in concluding the dispute by mutual agreement.
Atyar Advocates and Legal Consultants has experience in matters involvingmediation, arbitration, construction disputes, commercial and civil contracts, interior fit-out works, and alternative dispute resolution.The firm’s Founder also has experience acting as a neutral mediator in institutional disputes where the appointment is made by specialist arbitration and mediation institutions.
In infrastructure and electrical works disputes, the legal and technical aspects of the project are often inseparable.Claims involving delay or remaining contractual quantities require coordinated analysis of the contract, execution programme, drawings, correspondence, and the causes of suspension, withdrawal, or incomplete performance.Where both parties possess evidence supporting their respective positions, careful assessment of the evidentiary weight of each document becomes central to reaching a balanced arbitral determination.
The dispute concerned the design, manufacture, and installation of wooden interior works, with disagreements relating to the contractual term, completion of works, technical defects, and additional works.
The institutional mediation concluded with an amicable settlement.

Founder and Managing Partner, and an expert in the judiciary, legal practice, arbitration, and university education, with more than 25 years of combined experience.

Partner specialising in administrative contracts, investment, and litigation, with extensive experience in administrative and commercial cases.

Case Study Legal Review of a Compensation Claim Exceeding SAR 1 Million for Copyright Infringement Involving Academic Research Dispute Value...

Case Study Sole Arbitration in an Operation, Maintenance, and Management Dispute Involving a Medical Centre Investment of Approximately SAR 3...

Case Study Legal Representation in Establishing Ownership of a Fuel Station Property in Tathleeth Valued at More Than SAR 700,000...

Case Study SAR 3 Million Rent & Lease Termination Dispute Settlement Dispute Value SAR 3,000,000 Atyar Advocates and Legal Consultants...

Case Study Legal and Judicial Review of a USD 320 Million Liquidated Damages Claim Under a USD 1.09 Billion International...

Case Study Lifting Enforcement Orders in a Commercial and Financial Dispute Exceeding SAR 3 Million in Riyadh Dispute Value SAR...
If you are involved in a dispute concerning an infrastructure project, electrical works, a construction contract, or delay and compensation claims, Atyar Advocates and Legal Consultants provides experience in arbitration, contract analysis, construction claims, and commercial dispute resolution.
سواء كنت فردًا تبحث عن تمثيل قانوني موثوق أو شركة تحتاج إلى دعم قانوني متخصص، نحن في شركة أطيار للمحاماة والاستشارات القانونية جاهزون لمساعدتك. دعنا نكون شريكك القانوني في كل خطوة، بخبرة تتجاوز 23 عامًا في الأنظمة السعودية.
القانون التجاري والشركات