The dispute arose from a contract for infrastructure and medium-voltage electrical works in Jazan Economic City. The contract value exceeded SAR 5 million, with claims exceeding SAR 3 million, concerning project delays, delivery of drawings, and compensation for remaining quantities. A multi-member arbitral tribunal was constituted, with Prof. Dr. Turki Al-Tayyar appointed as a member pursuant to a judgment of the Commercial Court of Appeal in Riyadh. After approximately one year of proceedings, the tribunal issued its arbitral decision resolving the dispute.
Infrastructure and electrical works
More than SAR 5 million
More than SAR 3 million
Multi-member arbitral tribunal
Approximately one year
Arbitral decision issued resolving the dispute
The dispute arose from a contract concerning interconnection works, infrastructure facilities, and medium-voltage electrical works in Jazan Economic City. The parties disputed issues relating to contractual breaches, project delays, drawings, outstanding quantities, and compensation. The matter became further complicated following one party’s exit from the project and the resulting contractual and financial consequences. After considering the parties’ contractual, technical, and evidentiary submissions, the arbitral tribunal, which included Prof. Dr. Turki Al-Tayyar, issued its decision resolving the dispute.
Infrastructure & Electrical Works
Jazan
Interconnection & MV Electrical Works
Breach, Delay, Drawings & Compensation
The matter concerned an arbitration arising from an infrastructure and electrical works contract, with claims relating to delay, delivery of drawings, contractual breach, and compensation for the remaining contractual quantities.
The arbitral process required review of the contract, scope of works, drawings, execution programme, correspondence, documentary evidence, and financial claims.
Determining the technical and contractual obligations governing project execution.
Reviewing the scope and execution requirements of the medium-voltage works.
Assessing the causes of delay and their connection to each party’s obligations.
Evaluating the effect of the delivery or delay of drawings on project performance.
Assessing the contractual and financial basis for compensation relating to unperformed or outstanding quantities.
Weighing the documents and evidence submitted by both parties.
The departure of one party before completion of the project complicated the assessment of outstanding rights and obligations.
Each party relied on documents supporting its position regarding performance, delay, and responsibility.
The dispute required careful consideration of the relationship between the technical requirements of the works and the legal obligations under the contract.
It was necessary to determine whether the delay arose from performance issues, drawings, or other project-related causes.
The compensation claim required analysis of the contractual and financial basis of the quantities that remained uncompleted.
The dispute combined delay, drawings, contractual breach, and compensation claims, requiring each issue to be analysed within a coherent framework.
The sequence of performance, delay, delivery of documents, and drawings was reviewed chronologically.
The administrative basis and legal consequences of the vacation decision were examined in detail.
The consequences of withdrawal or cessation of work were analysed in relation to outstanding obligations and claims.
Technical documents and correspondence were assessed in light of the governing contractual provisions.
Each monetary claim was reviewed independently and linked to the specific work or alleged breach on which it was based.
The issues were considered by the tribunal through to the issuance of a decision resolving the claims submitted.
Serving as a tribunal member in proceedings constituted pursuant to a judicial appointment.
Analysing the contractual obligations relating to infrastructure and electrical works.
Assessing the documents, correspondence, and drawings submitted by the parties.
Reviewing the causes and consequences of delay in project execution.
Considering the financial and compensation claims submitted in the arbitration.
Participating in the deliberations and issuance of the arbitral decision.
Atyar Advocates and Legal Consultants has experience in matters involving commercial arbitration, international commercial arbitration, construction disputes, infrastructure works, electrical contracting, major projects, and complex commercial agreements.The firm’s Founder also has experience serving as sole arbitrator and as a member of arbitral tribunals in disputes involving construction, infrastructure, and major project claims.
In infrastructure and electrical works disputes, the legal and technical aspects of the project are often inseparable.Claims involving delay or remaining contractual quantities require coordinated analysis of the contract, execution programme, drawings, correspondence, and the causes of suspension, withdrawal, or incomplete performance.Where both parties possess evidence supporting their respective positions, careful assessment of the evidentiary weight of each document becomes central to reaching a balanced arbitral determination.

Founder and Managing Partner, and an expert in the judiciary, legal practice, arbitration, and university education, with more than 25 years of combined experience.

Partner specialising in administrative contracts, investment, and litigation, with extensive experience in administrative and commercial cases.

Case Study Final Judgment Confirming Ownership of a Fuel Station Property and Issuance of a Final Title Deed in Tathlith...

Case Study Legal Representation in an Inherited Property Encroachment Claim Dispute Value SAR 1,000,000 Disputes arising from encroachment by utility...

Case Study Eviction Judgment Set Aside and Tenant Permitted to Remain in the Property for the Full Lease Term The...

Case Study Petition for Reconsideration in an Occupational Disability and Employment Termination Dispute Disputes involving occupational disability, termination of service,...

Case Study Legal Representation in Real Estate Investment Lease with Promise of Ownership Al-Summan SAR 50M Dispute Value SAR 50,000,000...

Case Study Legal Advice and Assessment in a Compensation Claim Arising from Encroachment upon Real Estate Assets Exceeding SAR 200...
If you are involved in a dispute concerning an infrastructure project, electrical works, a construction contract, or delay and compensation claims, Atyar Advocates and Legal Consultants provides experience in arbitration, contract analysis, construction claims, and commercial dispute resolution.
سواء كنت فردًا تبحث عن تمثيل قانوني موثوق أو شركة تحتاج إلى دعم قانوني متخصص، نحن في شركة أطيار للمحاماة والاستشارات القانونية جاهزون لمساعدتك. دعنا نكون شريكك القانوني في كل خطوة، بخبرة تتجاوز 23 عامًا في الأنظمة السعودية.
القانون التجاري والشركات
صياغة العقود والوثائق القانونية
القانون المالي والمصرفي
الضرائب والزكاة والجمارك
العقارات والملكية الخاصة
© 2025 All Right Reserved Al Tayyar Leagal company
WhatsApp us